Catalog 目錄

過往部分工程 Prior Project

WATER SUPPLIES DEPARTMENT ‐ TSEUNG KWAN O SALT WATER PUMPING STATION 將軍澳(海水)抽水房

Client: Water Supplies Departments

Main Contractor: Ming Hing Waterworks Engineering Ltd.

Completion Date: 24‐Aug‐2019
Remarks:
‐ Model: Manual Slot Flood Barrier (MFB)
‐ Guide Rail Material: #316 S.S
‐ Panel Material: 3mm Thk. Alum.
‐ Overall height from floor level: 1.0m

Download >>> SUPPLY & INSTALL – MANUAL SLOT FLOOD BARRIER